Skip to content
Product Diary
24TuesdayNovember 2026
GuideRequirements and roadmap

Definition of ready: when a requirement is ready to estimate

A definition of ready from a running mandate: six conditions a business requirement meets before the technical side estimates it.

Alexander KarlInterim and fractional product owner
5 min read
In short

A definition of ready is a short list of conditions a requirement has to meet before the next step starts, for example before developers estimate it. It is not part of the Scrum Guide, so each team writes its own, and in one of my mandates it has six conditions. Critics warn that it turns into a stage gate when every condition is a hard rule.

Your developers get a requirement, start to estimate it and come back with questions the business side could have answered before. A definition of ready is an agreement against that: a short list of conditions a requirement has to meet before the next step starts.

What a definition of ready is

In Scrum teams the term stands for the criteria a backlog item has to meet before the team pulls it into a sprint. The articles I read mostly use the INVEST list for this: independent, negotiable, valuable, estimable, small and testable. Other lists name acceptance criteria, an estimate, a size limit and dependencies that are resolved.

The Scrum Guide does not contain a definition of ready. An article by a trainer on scrum.org calls it a complementary practice, next to the definition of done, which is obligatory in Scrum. So there is no official list, and each team writes its own.

Definition of ready vs definition of done

Definition of readyDefinition of done
QuestionCan work on this start?Is this finished?
WhenBefore the estimate or the sprintAt the end of the work
In the Scrum GuideNoYes

A German agile consultancy observes that the definition of done tends to grow as a team matures. The definition of ready gets shorter, they write, because the team needs less preparation from outside.

The six conditions before the estimate

In a running interim mandate for an ordering platform that is relevant for over 70 markets, a requirement passes four levels. It is called a demand there. The business side owns it up to the second level. The technical solution and the estimate come after that. The definition of ready sits at the gate to the second level, and a requirement that does not meet it stays at the first.

The list stands at the top of the requirement template, and each condition checks one section of it.

  1. 1The problem has a scopeIt names the order types and the markets it concerns.
  2. 2There is an outcomeAt least one result that can be measured or clearly observed.
  3. 3The flow is written downStep by step from the user’s point of view, for the normal case of this release.
  4. 4Scope and flow matchIn scope and out of scope are listed, and every item in scope belongs to a step in the flow.
  5. 5The screens are shownMockups are linked for every step that changes a screen, or the requirement says that no screen changes.
  6. 6The process model existsIt is stored and linked, and it describes the same thing as the written flow.

For the outcome a rough target is enough. A requirement without a number and without an observable change does not pass. What is left out for now is listed with the release it moves to, so that nothing looks forgotten. For the mockups rough ones are enough if the flow is clear.

None of the six conditions asks for a technical solution or an estimate. Those come at the next level. Before a requirement goes to the technical product owners, two colleagues review it.

I describe the working sessions on these requirements in “How to write business requirements developers can estimate”. How a requirement becomes part of a release was one of the topics of my first two weeks. I describe those weeks in “Interim product owner: what the role does in a mandate”.

Where the list does harm

Mike Cohn of Mountain Goat Software argues against rules that demand something to be 100% finished before work starts. Such a rule turns the definition of ready into a stage gate, and he calls that a waterfall process. He recommends guidelines over rules and writes that most teams do not need a definition of ready. Another article on scrum.org makes a related point: used as a gate, the checklist often becomes a contract between the developers and the product owner.

The list in the mandate above asks for mockups. In the working sessions in November we agreed that design work does not hold a requirement back at this gate. The condition is still on the list, and the agreement from the sessions stands next to it.

When it fits

In this mandate several teams build the platform, and an unclear requirement costs time in each of them. The people who write the requirements and the people who estimate them are not the same, so the point where one side hands over to the other needs a description.

A small team, where the person who writes the requirement sits next to the developer, can clear the same questions in a conversation. For that case Cohn’s advice to go without a definition of ready seems right to me.

I have not measured whether the list reduces the rounds of questions. In this mandate my role is measured on how fast a requirement gets from the first to the second level, and on how many rounds of questions follow after that. I cannot show values for either yet.

Questions and answers

A list of conditions a requirement or a backlog item has to meet before the next step starts. In Scrum that step is the sprint. Each team writes its own list.

Alexander KarlInterim and fractional product owner

I work as a product owner for companies that build digital products and online shops, for some months or for some days a month. The entries in this diary come from that work.

More entries in the diary
Fits this topic

Product Clarity Sprint

A short, fixed sprint that turns an unclear product question into a plan your team can build from.

More on requirements and roadmap

Let’s talk about
your product

Book a 30-minute intro call and we’ll look at your product together.

Or call +49 157 53125112, or write to hi@alexanderkarl.com.

Or send me a message

I answer within 3 hours.

Lass uns über
Dein Produkt sprechen

Buch ein Kennenlernen von 30 Minuten, und wir schauen uns Dein Produkt gemeinsam an.

Oder ruf an unter +49 157 53125112, oder schreib an hi@alexanderkarl.com.

Oder schreib mir eine Nachricht

Ich antworte innerhalb von 3 Stunden.