Skip to content

Product ownership for a shop without a test system

Deutscher Fenstershop sells windows and doors online. The company depended on one external developer. Because there was no test system, every change went straight to the live shop. As Fractional Product Owner I set the priorities and introduced rules for how changes reach the shop.

Client
Deutscher Fenstershop
Role
Fractional Product Owner
Period
Since December 2025
Industry
E-commerce for building products
Relaunchimprovements to the existing shop while the new one was built
01

The client

Deutscher Fenstershop sells windows, doors and sun protection online. The company is based in Baden-Baden and Bühl. Customers configure their product in the shop before they order.

02

Starting point

The shop had grown over about 15 years. One external developer had built it, so the company depended on him for every change. There was no test system. Every change went straight to the live shop.

In-house there was no UX experience and nobody who led the technical side. A new shop was being built in parallel. Until the new shop was ready, the existing one was supposed to convert better. The changes had to come in small steps and without risk for daily business.

03

Why it mattered

  • Someone who sets prioritiesThe company wanted a person between itself and the developer who set priorities and drove new developments.
  • Every release went live directlyWithout a test system, customers were the first to see a mistake.
  • Usable in the new shopWhat was improved in the old shop was also meant to work in the new one.
04

The product

The existing online shop with its configurator for windows and doors. The mandate was about improving this shop. The new shop was a separate project.

  • Configuratorcustomers put together their window or door
  • Navigation and categoriesthe way to the product
  • Service formsinquiry, complaint, withdrawal and contact in one place
  • Design system19 components
05

My approach

  1. Phase 1One backlogI made Jira the single channel to development and set the order of priorities: legal obligations first, then the shop frontend, then backend processes.OutputPrioritised backlog
  2. Phase 2Rules for releasesReleases went live in the morning from Monday to Thursday, in stages, with a notice to the team, monitoring and a rollback plan. Prototypes ran on a separate preview address first. That way the team could check them before they reached the shop.OutputRelease process
  3. Phase 3Roadmap from the configuratorI introduced Microsoft Clarity to see where visitors leave. The configurator was the largest drop-off point, so the roadmap started there. I wrote the concept for a configurator with two modes, one for laypeople and one for professionals. The client confirmed it as the direction.OutputRoadmap and configurator concept
  4. Phase 4Templates and design systemI wrote the concepts for the navigation, the homepage, the category pages and the service forms and delivered them as HTML and CSS ready for production. The navigation went from more than 200 unsorted entries to a clear hierarchy. All templates used a design system with 19 components.OutputTemplates and design system
  5. Phase 5Legal deadlinesI put the upcoming EU rules on the roadmap. The page for the right of withdrawal went live within the deadline.OutputCompliance roadmap
06

My role

Position
Fractional Product Owner
Setup
Alongside other mandates
Worked with
Management, the developers, SEO and CRM
Rhythm
A weekly jour fixe with everyone involved
  • Backlog and priorities in Jira
  • Release management
  • Roadmap
  • Configurator concept
  • Templates in HTML and CSS
  • Design system
  • Weekly jour fixe
07

Deliverables

  • Prioritised backlog
  • Release process
  • Roadmap
  • Configurator concept
  • Templates for navigation, homepage, category pages and service forms
  • Design system with 19 components
08

Result

Development got its work from one backlog with clear priorities. Releases followed fixed rules. The roadmap started at the configurator, and the client confirmed the concept with two modes as the direction. I built the design system and the templates so that they can also be used in the new shop.

200+
navigation entries sorted into one hierarchy
19
components in the design system
December 2025
start of the mandate
09

Methods and tools

  • User stories
  • Release management
  • HTML and CSS prototypes
  • Design tokens
  • Jira
  • Figma
  • Miro
  • Microsoft Clarity

More case studies

ERP software

A market-ready MVP in 3.5 months

Rapid Data wanted to extend its ERP with a transaction model. I set up product management and prioritised the backlogs for three markets.

MVP in 3.5 months3 marketsERP integration
Read case study

3.5 months

to a market-ready MVP in three markets

Leasing

A third option at the end of the lease

After 36 months, customers could only buy the bike or give it back. I led the follow-up leasing product from the concept to go-live, together with insurance, legal, CRM and marketing. When we disagreed on a detail, we ran an A/B test.

Product conceptBusiness caseAutomated end to end
Read case study

40%+

of expiring leases chose the new option

Let’s talk about
your product

Book a 30-minute intro call and we’ll look at your product together.

Or call +49 157 53125112, or write to hi@alexanderkarl.com.

Or send me a message

I answer within 3 hours.

Lass uns über
Dein Produkt sprechen

Buch ein Kennenlernen von 30 Minuten, und wir schauen uns Dein Produkt gemeinsam an.

Oder ruf an unter +49 157 53125112, oder schreib an hi@alexanderkarl.com.

Oder schreib mir eine Nachricht

Ich antworte innerhalb von 3 Stunden.